Telelect Digger Derrick Manual

1-64
  1. Telelect
  2. Telelect Digger Derrick Manual Online
  3. Telelect Digger Derrick Manual Free
OPERATION GUIDELINES

4 Telelect operations manual for the digger derrick. Late 80s early 90s models. 5 smaller owner/operator manuals. Questions and Answers There are currently no questions posted for this asset. Page 1 DIGGER DERRICK OPERATOR’S MANUAL This Operator’s Manual MUST BE READ prior to operating your Telescoping Material Handling DIGGER DERRICK PRINTED IN THE USA Original Instructions in English Terex South Dakota, Inc. 4632.; Page 2 DIGGER DERRICK Terex South Dakota, Inc. 500 Oakwood Road Watertown, SD 57201 4 6 3 2 8 0 - 0 9. Telelect Manual DERRICK PRINTED IN THE USA Original Instructions in English Terex South Dakota, Inc. 4632.; Page 2 DIGGER DERRICK Terex South Dakota, Inc. 500 Oakwood Road Watertown, SD 57201 4 6 3 2 8 0 - 0 9 / 1 4 T e r e x S o u t h D ak o t a, I n c. TEREX DIGGER DERRICK Page 6/29.

JIB INSTALLATION AND REMOVAL
The jib assembly, which consists of the jib mounting bracket and the jib, may be installed or removed as a
To install the jib in the boom tip, use the following procedures:
a.Attach the jib mounting bracket (1) to boom tip by aligning mounting holes in jib mounting bracket (1)
with mounting holes in boom tip. Secure in place with pin(s) (5).
b.Remove pin (3) from jib mounting bracket (1) and slide jib (4) into jib mounting bracket (1). Secure in
2.To install as complete assembly:
ManualTelelect
a.Attach the jib (4) and jib mounting bracket (1) to boom tip by aligning holes in jib mounting bracket (1)
b.Secure in place with pins (5).
c.After installation, check the roller(s), sheaves, and angle indicator for ease of operation. Lubricate if
d.Route winch line to the jib sheave as depicted on the diagrams. Starting at the winch, follow A to B.
When installing the jib assembly check pins, rollers, sheaves, jib pivot points, jib extension points, and jib

Telelect

rest, check for cracks, unusual wear, and missing or damaged hardware. If any discrepancies are found,
To remove the jib in the boom tip, use the following procedures:
a.Remove winch line from jib boom and jib mounting bracket (1).
c.Slide jib boom (4) clear of jib mounting bracket (1).
Telelect digger derrick manual transmissionTelelect Digger Derrick Manual
e.Support the jib mounting bracket (1) and remove pins (5).

Telelect Digger Derrick Manual Online

Boom
g.Store the pins (5) on the jib mounting bracket (1).
h.Store jib mounting bracket (1) in a suitable storage area.
a.Remove winch line from jib boom (4) and jib mounting bracket (1).
b.Support the complete assembly and remove pins (5).
d.Store pins (5) on the jib mounting bracket (1).
e.Store complete assembly in suitable storage area.
When using jibs on this Digger Derrick, use the chart that is applicable to the jib
operation. Do not use the Digger Derrick load capacity chart or handle poles with
Rope damage or excessive wear may result from improper routing of winch line.

Telelect Digger Derrick Manual Free

The diagrams illustrate the proper procedure for rope routing.